Many photovoltaic projects in Croatia are technically completed or ready to build – but the grid connection is delayed. Approval processes, connection inspections or missing capacities mean that generated electricity cannot be utilised economically.
We offer modular, container-based computing systems that are connected directly to your PV plant.
Power use exclusively on-site.
No reverse flow into the public electricity grid.
Operation fully as a local load.
Output can be switched on or off at any time.
Suitable electrical connection capacity, standards-compliant protection and switching technology, and sufficient space for container installation. The specific design is carried out project-specifically after technical assessment.
Plant ready — but grid connection delayed?
Approval processes taking months or years?
You want to use your power instead of waiting?